National Repository of Grey Literature 11 records found  1 - 10next  jump to record: Search took 0.01 seconds. 
Air-conditioning of Department store
Chorý, Vojtěch ; Rubina,, Aleš (referee) ; Rubinová, Olga (advisor)
The topic of this bachelor thesis is design of air-condition equipment for veterinary clinic. The clinic is located on the first floor of a multifunctional building in Brno city. For design purposes is used warm-air heating, air-conditioning and forced air-replacement. The theoretical part is focused on clean room issue. The Project part contains a project documentation for realization of two air-conditioning equipment. The first air-conditioning equipment is designed for warm-air heating and air-conditionig of clean rooms. The second air-conditioning equipment provides forcer air-replacement of the clinic.
Construction technology project of International Clinical Research Center in Brno
Brůžek, Zdeněk ; Čech, Václav (referee) ; Venkrbec, Václav (advisor)
The diploma thesis deals with construction and technological study of II. stage of construction of the international clinical research center in Brno. The aim is to design an appropriate technological process of construction of the main building and resources for construction. This work contains technological study of realization of the main technological stages of the main construction building and the technical report for site equipment with drawings and time schedule. The thesis is also focused on the installation of gypsum construction and clean room construction of the operating room, design of mechanical equipment and instructions for usage of the building.
Air-Conditioning in the hospital pavilion
Kops, Tomáš ; Blasinski, Petr (referee) ; Rubinová, Olga (advisor)
The aim of the bachelor thesis is to design and evaluate the air-conditioning system for the medical facility. The first and second above-ground floors are designed and designed to meet hygienic and operational conditions for medical facilities. The air-handling system provides fresh air into the interior, eliminating heat losses in the winter and heat gains in the summer.
Ventilation of a clean room in electronic industry
Tichý, David ; Štětina, Josef (referee) ; Charvát, Pavel (advisor)
The work describes an air conditioning and circulation system of a clean room environment in of a semiconductor production site. It is based on given requirements for air cleanness, temperature preasure and relative moisture. The first half of the work describes the way the system should work, classification of construction and operation of the site. The second half describes the calculations of the given parameters on which the system is designed. The calculations deal with - Air exchange and maintaining the required parameters - Designing the muti stage air filtration system - Designing the air flow speed, intake and outlet parameters of the air conditiong distribution system - Desingning the air conditioning units and their possitioning in the utility room
Air conditioning in Cleanrooms for Technology
Adamec, Jan ; Rubina, Aleš (referee) ; Rubinová, Olga (advisor)
The main objective of this thesis is to propose and evaluate two variants of HVAC systems for clean rooms. The proposed system is pressurized. As part of the experimental section in which the data obtained are evaluated - humidity and air temperature.
Air-Conditioning in the hospital pavilion
Kops, Tomáš ; Blasinski, Petr (referee) ; Rubinová, Olga (advisor)
The aim of the bachelor thesis is to design and evaluate the air-conditioning system for the medical facility. The first and second above-ground floors are designed and designed to meet hygienic and operational conditions for medical facilities. The air-handling system provides fresh air into the interior, eliminating heat losses in the winter and heat gains in the summer.
Construction technology project of International Clinical Research Center in Brno
Brůžek, Zdeněk ; Čech, Václav (referee) ; Venkrbec, Václav (advisor)
The diploma thesis deals with construction and technological study of II. stage of construction of the international clinical research center in Brno. The aim is to design an appropriate technological process of construction of the main building and resources for construction. This work contains technological study of realization of the main technological stages of the main construction building and the technical report for site equipment with drawings and time schedule. The thesis is also focused on the installation of gypsum construction and clean room construction of the operating room, design of mechanical equipment and instructions for usage of the building.
Ventilation of a clean room in electronic industry
Tichý, David ; Štětina, Josef (referee) ; Charvát, Pavel (advisor)
The work describes an air conditioning and circulation system of a clean room environment in of a semiconductor production site. It is based on given requirements for air cleanness, temperature preasure and relative moisture. The first half of the work describes the way the system should work, classification of construction and operation of the site. The second half describes the calculations of the given parameters on which the system is designed. The calculations deal with - Air exchange and maintaining the required parameters - Designing the muti stage air filtration system - Designing the air flow speed, intake and outlet parameters of the air conditiong distribution system - Desingning the air conditioning units and their possitioning in the utility room
Air conditioning in Cleanrooms for Technology
Adamec, Jan ; Rubina, Aleš (referee) ; Rubinová, Olga (advisor)
The main objective of this thesis is to propose and evaluate two variants of HVAC systems for clean rooms. The proposed system is pressurized. As part of the experimental section in which the data obtained are evaluated - humidity and air temperature.
Air-conditioning of Department store
Chorý, Vojtěch ; Rubina,, Aleš (referee) ; Rubinová, Olga (advisor)
The topic of this bachelor thesis is design of air-condition equipment for veterinary clinic. The clinic is located on the first floor of a multifunctional building in Brno city. For design purposes is used warm-air heating, air-conditioning and forced air-replacement. The theoretical part is focused on clean room issue. The Project part contains a project documentation for realization of two air-conditioning equipment. The first air-conditioning equipment is designed for warm-air heating and air-conditionig of clean rooms. The second air-conditioning equipment provides forcer air-replacement of the clinic.

National Repository of Grey Literature : 11 records found   1 - 10next  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.